Why your renovation price keeps going up after you sign

You signed at one number. Then come requests for extra electrical work, screeding or hacking. Missing items and vague lines can create surprises, but changes you request or genuinely hidden site conditions can also change the price. Compare the agreed scope before treating an extra charge as justified.

Where the extra cost comes from

Before you sign: five checks

  1. Every main trade has its own line with a quantity: m² for tiling and painting, feet run for carpentry, number of points for electrical and plumbing.
  2. Allowances are written down (for example S$/m² for tiles) and match what you plan to buy.
  3. The quote states what is excluded. If it says nothing, ask in writing.
  4. The firm did a site visit and noted the existing condition: hacking scope, screed, walls, ceiling, pipes.
  5. The contract says variations need your written approval and a price before the work is done.

Compare 2 or 3 quotations row by row (method in how to compare renovation quotations). Mark each item as included, excluded, bundled or unclear. Ask each firm to price the same scope, quantities and specifications, including applicable GST, before comparing totals.

When the price goes up mid-project